<strike id="gegfc"><dl id="gegfc"></dl></strike>
<sub id="gegfc"></sub>

    <mark id="gegfc"></mark>

      World's highest-altitude grid project starts construction in Tibet

      Source: Xinhua| 2019-09-17 23:20:00|Editor: Mu Xuequan
      Video PlayerClose

      BEIJING, Sept. 17 (Xinhua) -- The world's highest power transmission and transformation project started construction Tuesday in the Tibet Autonomous Region.

      With a total length of 1,689 km, the project, which goes from Xigaze city to Ali Prefecture, stretches across permafrost, no man's land and swamps.

      The project requires a total investment of 7.4 billion yuan (about 1.05 billion U.S. dollars) and is planned to be completed in 2021, benefiting nearly 380,000 people along the line.

      With towers at an average elevation of over 4,000 meters, the project is said to be an extremely difficult "power heaven road" due to the harsh construction environment, dangerous road conditions, poor logistics support and strict environmental protection requirements.

      The project connecting 10 Tibetan counties will end the days when the power grid of the Ali Prefecture is isolated from the rest of Tibet, thus improving the reliability of power supply in the prefecture, industrial sources said.

      It will also help Tibet's poverty reduction and paves the way for the supply of Tibet's clean energy to South Asia, the sources said.

      Since 2007, the State Grid Corporation of China has injected 14.5 billion yuan into Tibet's power grid construction, effectively improving the local power supply.

      TOP STORIES
      EDITOR’S CHOICE
      MOST VIEWED
      EXPLORE XINHUANET
      010020070750000000000000011105091383992831
      中文字幕日韩无线码在线一区_制服肉丝亚洲中文字幕_日韩欧美无砖专区一中文字目_国产精品点击进入在线影院高清
      <strike id="gegfc"><dl id="gegfc"></dl></strike>
      <sub id="gegfc"></sub>
      
      
        <mark id="gegfc"></mark>
          亚洲人成网站999久久久综合 | 亚洲第一国产综合野狼 | 午夜亚洲国产理论片中文飘花 | 亚洲精品国产丝袜久久 | 一区二区免费精品在线观看国产 | 亚洲午夜久久久精品影院 |